01/07 Daily Stand-up

Ricky:

  • Done: Everything has been posted on blog, and edited half of the design document.
  • To do: Finish the design document, and celebrate with team mates.

Cezar:

  • Done: Everything has been finished.
  • To do:Fixing some bugs, test on location, and celebrate.

Sai:

  • Done: change the wall animation, and make sure the style is same as other animation.
  • To do: final test, make sure everything is work well.

Vadim:

  • Done: Installation is ready for use.
  • To do: Make edits for design document and prepare location

Kafka:

  • Done: Finished the decoration and rest of personal assignment
  • To do: Make the project completely and perfectly.

Hao:

  • Done:finished the flyer design
  • To do:print the flyer, to see how it looks and if it fits the fold paper version.

Screen Shot 2016-07-04 at 13.48.30Screen Shot 2016-07-04 at 13.49.27

Wall & Floor mapping v.2

After last time we test projection mapping, I found out that black background and dark style can not got the desired effect, because the streetlight is near our projector. So I try to change the them to write and light style. 

Keep all the animation in same style is also something need considered. The wall animation is looks not same as floor animation. The new version change the color style to keep them in same style.

屏幕快照 2016-07-04 00.08.14屏幕快照 2016-07-04 00.07.52

 

 

     

 

30/06 Daily Stand-up

Ricky:

  • Done: The ultrasonic sensor has been done and put into the installation.
  • To do: Post everything I’ve done on blog and prepare to editing the final vision of design document.

Cezar:

  • Done: research about how to make the unity/screen show looks nicer.
  • To do: Add visualisation into unity.

Sai:

  • Done: floor animation changed to 3d colorful style. keep the style is same.
  • To do: change the wall animation to same style as floor animation.

Vadim:

  • Done: sensor inside the installation, description of user tests for documents.
  • To do: Change hardware diagramm and finilize physical part of installation

Kafka:

  • Done:Design the flyer and help others
  • To do:Print flyer and laser cutting wood for decoration.

Hao:

  • Done:searching the information and make the flyer.
  • To do:prepare to print all the stuff.

Screen Shot 2016-07-04 at 13.42.54Screen Shot 2016-07-04 at 13.44.25

29/06 Daily Stand-up

Ricky:

  • Done:QR code and NFC could been used on our installation now. Found some stickers we could use on the ground.
  • To do:Finish the ultrasonic sensor, and put it into our installation.

Cezar:

  • Done: the button are now fixed and working nicely.
  • To do: make the video into unity, so that people press the button could see the intro on main screen.

Sai:

  • Done: change the background color of button animation, make sure they can use in unity project.
  • To do: final test TSPS syphon and Unity syphon in Madmapper.

Vadim:

  • Done: user test and user journey video finished
  • To do: make edits for audio, solder ultrasonic sensor

Kafka:

  • Done: Laser cut wood for the rest beer mats, the sensor and LEDS.
  • To do: Making flyer for our project and decoration the button set.

Hao:

  • Done:Laser cut wood for the rest beer mats.
  • To do:make the flyer at home

Screen Shot 2016-07-04 at 13.42.54Screen Shot 2016-07-04 at 13.40.31