01/07 Daily Stand-up

Ricky:

  • Done: Everything has been posted on blog, and edited half of the design document.
  • To do: Finish the design document, and celebrate with team mates.

Cezar:

  • Done: Everything has been finished.
  • To do:Fixing some bugs, test on location, and celebrate.

Sai:

  • Done: change the wall animation, and make sure the style is same as other animation.
  • To do: final test, make sure everything is work well.

Vadim:

  • Done: Installation is ready for use.
  • To do: Make edits for design document and prepare location

Kafka:

  • Done: Finished the decoration and rest of personal assignment
  • To do: Make the project completely and perfectly.

Hao:

  • Done:finished the flyer design
  • To do:print the flyer, to see how it looks and if it fits the fold paper version.

Screen Shot 2016-07-04 at 13.48.30Screen Shot 2016-07-04 at 13.49.27

Advertisements

30/06 Daily Stand-up

Ricky:

  • Done: The ultrasonic sensor has been done and put into the installation.
  • To do: Post everything I’ve done on blog and prepare to editing the final vision of design document.

Cezar:

  • Done: research about how to make the unity/screen show looks nicer.
  • To do: Add visualisation into unity.

Sai:

  • Done: floor animation changed to 3d colorful style. keep the style is same.
  • To do: change the wall animation to same style as floor animation.

Vadim:

  • Done: sensor inside the installation, description of user tests for documents.
  • To do: Change hardware diagramm and finilize physical part of installation

Kafka:

  • Done:Design the flyer and help others
  • To do:Print flyer and laser cutting wood for decoration.

Hao:

  • Done:searching the information and make the flyer.
  • To do:prepare to print all the stuff.

Screen Shot 2016-07-04 at 13.42.54Screen Shot 2016-07-04 at 13.44.25

29/06 Daily Stand-up

Ricky:

  • Done:QR code and NFC could been used on our installation now. Found some stickers we could use on the ground.
  • To do:Finish the ultrasonic sensor, and put it into our installation.

Cezar:

  • Done: the button are now fixed and working nicely.
  • To do: make the video into unity, so that people press the button could see the intro on main screen.

Sai:

  • Done: change the background color of button animation, make sure they can use in unity project.
  • To do: final test TSPS syphon and Unity syphon in Madmapper.

Vadim:

  • Done: user test and user journey video finished
  • To do: make edits for audio, solder ultrasonic sensor

Kafka:

  • Done: Laser cut wood for the rest beer mats, the sensor and LEDS.
  • To do: Making flyer for our project and decoration the button set.

Hao:

  • Done:Laser cut wood for the rest beer mats.
  • To do:make the flyer at home

Screen Shot 2016-07-04 at 13.42.54Screen Shot 2016-07-04 at 13.40.31

28/06 Daily Stand-up

Ricky:

  • Done: The second test has been done on the location during 10 p.m- 3 a.m. The sensor has been finished half.
  • To do: Solve some of the problem we have face, change some stuff in the concept, and the third test on the location, film the user journey. Launch the online application, create QR code and NFC.

Cezar:

  • Done: The second test on the location during night has been done.
  • To do: lunch the online application, and make dropbox data bace for the online application.

Sai:

  • Done: second test during night. projector adjusted and test all the connection.
  • To do: basic on the result of test, make some change of animation. both wall animation and floor animation need changed.

Vadim:

  • Done: wiring on location is managed, brought 3 cables, 2 for speakers,1 for the power. Test on location during night.
  • To do: Edit videos, create user test video and write choises and problems made for the final design document

Kafka:

  • Done: Wood beer mats printed and fixing part of the button set.
  • To do:Making videos for the project

Hao:

  • Done: wood mats cutting  first version
  • To do:wood mats cutting second version

Screen Shot 2016-07-04 at 13.39.52Screen Shot 2016-07-04 at 13.40.31

27/06 Daily stand-up

Ricky:

  • Done: Sounds system has been tested on the location, and the sensor, buzzer has been delivered.
  • To do: Make a distance sensor with arduino, ultrasonic sensor, buzzer and leds. Second test for sound and visual animation on the location in the evening.

Cezar:

  • Done: test on the location, and found the button doesn’t work after once play.
  • To do: going to fix the problem in unity and button.

Sai:

  • Done: Unity crash down, so I gonna fix them and make prapers for tomorrow’s test.
  • To do:

Vadim:

  • Done: Test on location is done
  • To do: Edit videos and book keys from the door downstair wirelab in order to shorten the wire and have louder sound

Kafka:

  • Done: Printed sample  of the reward wood beer mats and decided the final design. Recording the video when we test the project during night time.
  • To do: Print the poster and wood beer mats.

Hao:

  • Done:
  • To do:

Screen Shot 2016-07-04 at 13.36.44Screen Shot 2016-07-04 at 13.30.23

24/06 Daily Stand-up

Ricky:

  • Done: Re-assigned the task to each teammates, small meeting to discuss what we should do to improve our installation.
  • To do: Test the sounds system on the location, and buy ultrasonic sensor, buzzer in order to complete our installation.

Cezar:

  • Done: Did the online application data collect, and research about the ultrasonic sensor.
  • To do: Test the sounds system, fixing bugs in our program.

Sai:

  • Done: research about arduino sensor, ultrasonic sensor and led connect, make a first diagram of connect.
  • To do: focus on interaction function, find a solution to connect small animation with audio button.

Vadim:

  • Done: couple variations of sound for plates is done.
  • To do: Connect everything on a location and make test.

Kafka:

  • Done: Test the installation out of the wirelab. The bluetooth is not working for the location and because of the wire for the speaker is too long and the sound is not loud enough.
  • To do: Find out some way to deal with day time and attractive people come to our installation.

Hao:

  • Done:
  • To do:

Screen Shot 2016-07-04 at 13.29.10Screen Shot 2016-07-04 at 13.30.05

23/06 Daily stand-up

Ricky:

  • Done: Made new plan for team:1. Animation connect with unity– if we couldn’t find a way to connect them together, we could just use the loop animation to project on the ground. Not necessarily have to connect them together. We already have the interaction with sounds during the day. 2. Sounds visualisation- this is the priority, we have to find a way to make real time visualisation. 3. User test- this is also important.  have to range a time with them so we could make at least two videos. 4. Sticker or other stuff- have to find a way to fix this. 5. Poster/ rewards- You guys have to find a place and print out the posters, also, at first, we plan to allow users to download the sounds they made as reward/ something they can take away with them. Since we are no longer to do this, I was thinking maybe print some stickers of our logo as a reward to give to those people who tried our installation. 6. Extra- distance sensor with led- Sai and me will trying to find a way to make this thing before Wednesday.
  • To do: finish the personal journey and the user test on location. Assign and explain tasks to teammates.

Cezar:

  • Done: The button has been fixed, and it is now working properly.
  • To do: going the the location to do some test and user test.

Sai:

  • Done: talking with team numbers about reward and decided use wooden beer mat be the souvenir for user.
  • To do: research about distance sensor with led and buzzer.

Vadim:

  • Done: Testeed different bluetooth and wifi speakers on location. Solution 60m wire for testing.
  • To do: sound design for instalation

Kafka:

  • Done: test speaker in wirelab, make the gift for the uer and made design plan.
  • To do:finish the wood cutting gift and going to make the button sensor .

Hao:

  • Done:
  • To do:

Screen Shot 2016-07-04 at 13.25.45

Screen Shot 2016-07-04 at 13.26.25